Step 2 roll out rubber membrane.
Rubber roll roofing installation.
It also helps if you first install a layer of roofing felt.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a.
Using a measuring tape measure 35 inches 89 cm up from the bottom of the roof and make a mark with chalk.
To seal a plumbing vent spread roofing.
To install roll roofing you ll need to cut the material into long strips of the correct length for your roof and lay it flat.
Installing the rolled roofing 1 mark a chalk line to identify the end of your first layer.
Plan so that no two butt joints are closer than 2 feet from each other.
One piece rubber roof fully adhered.
Besides creating extra weight for your house to.
Starting at one side of the roof roll out the rubber roofing materials.
For extra durability you may install roll roofing in two layers.
This is the type of system i like to install best one of the key strengths of a rubber roof is the lack of joints and therefore potential leaks epdm rubber membrane can be cut to virtually any size from one piece without joins up to 15m x 30m.
A rubber roof will not hold up to spans of more than 1 4 inch in size.
This could be branches leaves rocks or anything like that.
Let is sit on the roof for 30 minutes.
The strips should always be horizontal.