Center a 914 mm 36 width strip of an ice and water protector membrane in the valley.
Roofing shingles how to apply.
Use your chalk and tape measure to mark about 12 inches up on the roof for the first set of shingles.
Trim the shingles away from the ridge vent hole.
Complete the application of underlayment and valley flashing before the roofing shingles are applied.
To start installing shingles line up aluminum drip edge flush with the edge of the roof and make a pencil line at the top on each end of the house.
The recommended flashing material is a 28 gauge galvanized metal or an equivalent corrosion resistant non staining material check with local codes.
Shingling a shed and want some tips.
Nail metal flashing called drip edge along the bottom edge of the roof deck near the gutters.
Many pros shingle in a vertical line up the roof because it s much faster.
Starting at the bottom of the roof map out a guideline with chalk.
Adhere the joint where the cut edges of the shingles meet the dome with roofing tar.
Using the chalk line snap a line between the two marks to get a straight edge.
Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps.
See below for a shopping list tools and steps subscr.
Adhere the shingles adjacent to the flange with roofing tar.
If the plumbing vent is close to the peak of the roof lap the shingles over the peak of the roof.
Pull the drip edge down about a half inch from that line to create a gap between the drip edge and the fascia board.
Ask this old house general contractor tom silva reveals the best ways to secure shingles to a roof.
Install a starter strip.
Use sticky back ice and water shield as underlayment where ice dams or leaf and twig dams are likely to build up and at.
Watch and see how easy it is.
How to do it prep work space.
First snap a line for the top of the.
Continue to chalk additional guidelines based on the width of the shingle through at least four courses rows across.